The photo of our living room shows how chaotic our house is at the moment. All of the lumber for our ceilings and floor is stored in the living room so the wood can acclimate for several weeks before being installed. And all our food from the pantry is packed in boxes since the old cabinets have been taken out. Unfortunately while we were gone not a lot was done due to the delay in wiring for tv/cable. But the schedule is back on track. The insulation was installed yesterday and the drywall installers arrived began today. It should take 1-2 weeks to complete all the drywall work.