The outdoor shower is almost done. The floor will be finished if there is a break in the cold weather. Lance is insistent that the only three living beings that will ever use the outdoor shower are 1) me, 2) our brother-in-law Jon and 3) Mr. Fin. I'm hoping that future guests will prove him wrong!
This morning we sat down with David, our contractor, to review the list of outstanding items. Our expectation is that everything should be wrapped up by January 28th. The big items left to complete are: cabinetry in belvedere (well underway), finishing of hickory floors in bedrooms and belvedere, installing all interior doors and final painting/touchups. As expected, there is a long list of "nits" that we hope also will be tackled before 1/28.